SOCOTEC Middle East supported the construction project for the new headquarters of Credit Libanais in Beirut. Our teams studied all the technical aspects of its construction and applied their expertise to ensure that the project complied with current standards and regulations.
Key information
- Name of the project: Headquarters of the Credit Libanais
- Date: 2011-2015
- Client: Credit Libanais
- Size: 48 622 m²
- Location: Beirut, Lebanon
Copyright : Crédit Libanais
Talk to our experts
Project details
Founded in 1961, Credit Libanais is a major bank in Lebanon that has maintained a strong presence in the country over the years. With a subsidiary bank in Senegal, Credit Libanais stands as a prominent institution in the banking industry.
CL Group offers a diverse range of services, including conventional banking, insurance, leasing, real estate, tourism and ticketing, debt collection, information technology, and advertising.
CL Group goes beyond traditional banking services, providing advanced solutions in areas such as Ecommerce, Smart Cards, Points of Sale, ATM networks, and secure e-banking services.
While continuing to provide a great customer experience, CL embarked on a digital journey transformation strategy over the past two years to cater to the changing needs of millennials.
For its new headquarters, CL Group has built a high-rise tower in the heart of Lebanon's capital. The project comprises two blocks. Block A is the tower building, featuring a ground floor, 33 upper floors, and four basement levels. It incorporates a meticulously designed vertical circulation system to efficiently manage the flow of people throughout the building. On the other hand, Block B, the annex building, consists of seven basement floors, a ground floor, a mezzanine, and two additional floors providing even more space for the Bank's operations.
Details of the tasks entrusted
SOCOTEC Middle East played a crucial role in ensuring the success of the project. Throughout its duration, our team diligently assessed every technical aspect, from initial design to final construction. We relied on our extensive knowledge and experience to venfy that the project met all necessary standards and regulations.
This involved:
- Solidity
- Seismic Protection
- Life & Fire Safety
- Disabled Access
- Shoring & Enabling Works
- Functioning of Technical Equipment